Supplied 600+ flow racks across 15 specifications for an automotive engine line, with free 3D design and 45-day delivery.

Modular workbenches and line-side trolleys for truck assembly, with ESD-safe options for electronics sub-assembly.

Flow racks and shelving for automotive aftermarket parts. FIFO compliant, optimized warehouse footprint.

ESD-safe lean pipe workbenches for PCB assembly with integrated lighting, tool rails, and grounding system.

Gravity-fed flow racks for order picking. Capacity 200kg/shelf, dramatically improved pick rate.

Stainless steel SUS304 pipe systems for daily wash-down environments. Food-grade and FDA-compliant.
We've supported 50+ manufacturers globally. Let's talk about your project.
Contact Us NowThe case studies above show what was installed. This section is about how it got installed without stopping the line, because that is usually the buyer's real concern.
We do not quote from a product list. We ask for the layout, the parts, the weights and the takt time, then draw the stations. Roughly one in five enquiries changes shape at this stage: a rack that was going to be 1.5 m becomes 2 m, or a workstation that was one bench becomes two. Catching that before production is free. Catching it after shipping is not.
Every project gets a 3D model before cutting. The buyer signs off on the model, not on a catalogue page. This is also where we check the boring things that stop installations: door widths, column positions, power drops and floor level differences.
For line conversions, we ship in the order the customer will install, not in the order that is convenient for the factory. The first container carries the frames that replace the first station. That is how a plant keeps running during a changeover instead of shutting down for a week.
We provide assembly drawings, a video walkthrough and a named contact for the installation period. After that, the two-week check matters more than the handover: joints settle, operators find the awkward reach, and one or two shelves always need to move.
If you have a conversion coming up, send the layout. We will tell you what can be reused and what genuinely has to be new, which is often less than expected.